CSH-10TRI-255: Installing the Smart Triangle Lights

Created by Punit Kanwar, Modified on Wed, 18 Sep at 3:00 PM by Punit Kanwar

Question: How do I install the CSH-10TRI-255 AmbiColour Smart Triangle Lights?

Answer:

  1. Peel off one side of the adhesive tape and attach it to the back of a triangle light.
  2. Connect the controller to the IN port on the light.
  3. Attach a connection cable to the OUT port and connect it to the next light’s IN port.
  4. Press each light firmly on the wall for 30 seconds to ensure adhesion.
  5. Repeat for additional lights, then connect the power adapter to the controller and power it on.

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article